IFFCO’s Mother Plant
IFFCO’s first Urea & Ammonia production Facility, Kalol Production unit was commissioned in 1974 with a production capacity of 910 MTPD of Ammonia & 1200 MTPD of Urea. Over the last 4 decades, IFFCO Kalol Production unit has expanded & reinvented to stay at par with the modern production units both in terms of production capacity as well as the technology. Today IFFCO Kalol plant has a production capacity of 1100 MTPD of Ammonia and 1650 MTPD of Urea.
Production Capacity & Technology
IFFCO Kalol Plant is into its 40th year of production and is still one of the largest in terms of its production capacity
| Products | Daily Production Capacity(Metric Ton Per Day (Metric Ton Per Day) |
Yearly Production Capacity(Metric Ton Per Annum) (Metric Ton Per Annumn) |
Technology |
| Ammonia | 1100 | 363000 | Kellogg, USA |
| Urea | 1650 | 544500 | Stamicarbon, Netherland |
Production Trends
Energy Trends
Plant Head
Mr.Sandeep Ghosh Executive Director
Mr. Sandeep Ghosh is a Chemical Engineering graduate from the University of Jadavpur. He joined IFFCO Kalol Unit as a graduate engineer in 1988.His experience spans 36 years, from production management, project conception to commissioning of Ammonia & Urea plants at IFFCO Kalol. He has held several key positions at IFFCO in the past which includes his stint as Project Head of NFP-II project and Unit Head of Nano Fertiliser Plant at Kalol. Currently, he holds the position of Executive Director and heads the Kalol Unit.
Awards & Accolades
Certifications
Kalol Unit boasts of the following certifications:
- ISO 50001:2011 for the Energy Management System (EMS).
- Integrated Management System (IMS) consisting of Quality Management System (ISO 9001:2015)
- Environment Management System (ISO 14001:2015)
- Occupational Health and Safety Management System (OHSAS 18001:2007)
- Kasturinagar Township for Environment Management System (ISO 14001:2015) and under Green Residential Society Rating System of Indian Green Building Council (IGBC) under the platinum category
Other Initiative
Energy Saving Project (ESP) at Kalol
A number of upgrades & schemes have been implemented at the Kalol plant recently (2016 – 18) in an effort to make it more energy efficient:
Ammonia Plant
- New Secondary Reformer Burner.
- Liner Replacement of primary waste heat boilers (101-CA/B) with improved material of construction (MOC).
- Hydro De-Sulphurization of feed gas in place of activated carbon.
- New Process Air-Steam Coil with improved Material of construction (MOC).
- New single steam turbine (103-JT) for Syn Gas Compressor in place of two turbines.
- New Methanator Exit Cooler (115-C) with better design.
- MP Process Condensate Stripper in place LP Process condensate Stripper.
- Ammonia recovery from Syn Loop of LP Flash off gases.
- New Low Temperature HP steam superheat coil with higher area for better heat recovery.
Urea Plant
- High Efficiency Tray (HET) in Urea Reactor.
- VAM package for CO2 cooling.
- New CO2 Cooler in place of direct contact cooler.
- HP Ammonia Preheater (H 1250).
- HP Split Flow Loop and New High Pressure Carbamate Condenser (HPCC).
- HP Carbamate Ejector in HP Loop.
- New Second stage Evaporator Heat Exchanger with higher area.
Expansion Project phase II
one-Ammonia-Urea complex along with associated Offsite/Utilities & captive power plant to meet the requirement of whole complex.